Adelanto, CA 92301,0 Calleja
REQUEST A TOUR If you would like to see this home without being there in person, select the "Virtual Tour" option and your advisor will contact you to discuss available opportunities.
In-PersonVirtual Tour
Sat
5
Apr
Sun
6
Apr
Mon
7
Apr
$ 48,700
Est. payment /mo
Save
Active

0 Calleja Adelanto, CA 92301

4.57 Acres Lot


UPDATED:

Key Details

Property Type Vacant Land

Sub Type Lots/Land

Listing Status Active

Purchase Type For Sale

MLS Listing ID IG25070031

HOA Y/N No

Lot Size 4.569 Acres

Acres 4.5694

Property Sub-Type Lots/Land

Property Description

4.5-acre parcel located off road for ease of access to local transportation routes. All utilities are nearby. The High Desert continues to demand additional housing with major development projects including Brightline Wests High-Speed Rail and the Barstow International Gateway (BIG). With stops in Apple Valley and Hesperia, the High-Speed Rail will travel a route of 218 miles and reach top speeds of 186 mph. The project will bring an estimated 10,000 jobs to the area throughout its development and is under construction in Las Vegas, full service expected by December 2028. The rail will enhance connectivity between the High Desert, Las Vegas, and the greater Los Angeles area. Barstow is nearing completion of their General Plan Update to welcome BIG, a state-of-the-art intermodal distribution facility run by BNSF Railroad. Spanning 4,500 acres and bringing an investment of $1.5 billion dollars, BIG aims to relieve the Ports of Los Angeles and Long Beach by importing freight directly from ship to rail, where it will be received and broken down for regional and domestic distribution. This forthcoming project will maximize supply change and bring an estimated 20,000 jobs to the Barstow area. Buyer to verify all information contained herein. Agent and their representatives are not responsible for the accuracy of these claims.
4.5-acre parcel located off road for ease of access to local transportation routes. All utilities are nearby. The High Desert continues to demand additional housing with major development projects including Brightline Wests High-Speed Rail and the Barstow International Gateway (BIG). With stops in Apple Valley and Hesperia, the High-Speed Rail will travel a route of 218 miles and reach top speeds of 186 mph. The project will bring an estimated 10,000 jobs to the area throughout its development and is under construction in Las Vegas, full service expected by December 2028. The rail will enhance connectivity between the High Desert, Las Vegas, and the greater Los Angeles area. Barstow is nearing completion of their General Plan Update to welcome BIG, a state-of-the-art intermodal distribution facility run by BNSF Railroad. Spanning 4,500 acres and bringing an investment of $1.5 billion dollars, BIG aims to relieve the Ports of Los Angeles and Long Beach by importing freight directly from ship to rail, where it will be received and broken down for regional and domestic distribution. This forthcoming project will maximize supply change and bring an estimated 20,000 jobs to the Barstow area. Buyer to verify all information contained herein. Agent and their representatives are not responsible for the accuracy of these claims.

Location

State CA

County San Bernardino

Area Adelanto (92301)

Others

Monthly Total Fees $26

Acceptable Financing Cash

Listing Terms Cash


San Diego Regional MLS (SDMLS)
Listed by Alan Sarrail • KELLER WILLIAMS-LA QUINTA
agent

Don Pelletier

Broker | License ID: 00866225

+1(858) 336-1114

GET MORE INFORMATION

Name
Phone*
Message

Go tour this home

0 Calleja